Fleet guide

Fleet due dates in winter: spread them over the lay-up, not all in March

In winter the boats are ashore and nobody looks at due dates. In March they all arrive together, just when the season needs preparing.

Published on 26 November 2026

In brief

  • You can already see what falls due between now and launch, boat by boat, most urgent first.
  • You spread renewals, inspections and services over the lay-up, when workshops and suppliers have time.
  • Work done at the yard goes into the history, signed by whoever did it.
  • In spring you know which boats can go out, and what the others are missing.

The problem: in March everything falls due at once

At the end of the season the fleet comes ashore and attention moves elsewhere. Meanwhile the dates keep running: insurance, liferaft services, extinguishers, postponed engine services.

In March the due dates pile up: workshops are full, service stations have waiting lists, and boats cannot go out for the first charter of the season.

Using the winter to arrive ready

1. Look at the queue now

List every due date from today to launch, boat by boat. Those falling in winter are handled in winter; spring ones can be brought forward.

2. Spread the work

A renewal in December, an inspection in January, services in February: in winter workshops and suppliers have time, and every boat gets its turn.

3. Close every job

A job done but not recorded can't be found in March. Every job closed in winter is a due date you won't be chasing in spring.

What ALFA does for the fleet in winter

It lines up the whole fleet's due dates

Plancia's schedule brings together the insurance, safety equipment and maintenance of every boat and sorts them by urgency. Reminders arrive before the due date, with time to get organised.

ALFA Plancia: boat fleet maintenance schedule sorted by urgency, with demo data
Plancia screen with demo data.

It puts the yard's work into the history

The mechanic scans the boat's QR code and proposes the job from the app. You approve it, from Plancia too, and the job goes into the history with the mechanic's signature.

In spring it tells you which boats are ready

The “Can it go out?” column gives one answer per boat, with the reason. If a piece of data is missing, the boat shows as “Cannot be verified” until you complete it.

An example of an organised winter

Example with demo data. In December you open the schedule: Grecale's insurance expires in January, Levante's liferaft in February, and Scirocco's service is already overdue. You renew the insurance straight away, send the liferaft for service in January, and the mechanic does the service in February and proposes it from the QR code. In March, in the “Can it go out?” column, all three boats are green.